IBBC’s Autumn Conference – Open for Business Engagement

IBBC’s Autumn conference is back with a bang and open for business engagement.

On 22nd November this year the overarching conference topic is looking to the future with ‘sustainability’- whether in terms of energy and renewables, the Iraqi economy and its diversification, or sustaining finance, logistics and training. Underpinning much of this is the application of technology and modernising ways to run a successful economy, with the tech forum’s online sessions.

With a successful election now completed and a new government being formed, it’s a good time to discuss the prospects for reform and sustainability.

IBBC members find that the Autumn conference is probably the best forum to meet the leaders in the region and those engaged with provision of supply chains and decision making. Many of Iraq’s industry sectors have regional headquarters in Dubai, which enables the high turnout and interest in the networking opportunities.

The current speaker line-up is probably the best for some years, featuring the Iraqi Minster of Oil H.E. Ihsan Abdul Jabbar Ismaael giving a keynote speech, H.E. Dr Thani bin Ahmed Al Zeyoudi UAE Minister of State for Foreign Trade. Dr Salem Chalabi, President and Chairman of the Trade Bank of Iraq, Iraqi Ambassador to the UAE H.E. Mudaffar Mustafa Al Jubouri and UK ambassador Mr Mark Bryson-Richardson, Mr Simon Penny, UK’s Consul General and Trade Commissioner for the region, and top academic Professor Frank Gunter on the economic outlook for Iraq.

For those engaged with energy, Mr Zaid Elyaseri from BP will be speaking, and Dunia Chalabi will be representing new Iraqi entrants Total, who have signed contracts to invest USD 27 billion in and plan to bring in hundreds of expatriates into Iraq to develop the Ar-Ratawi oil field and build gas capture, solar power and injection water facilities. Leading figures from Oilserve, Ms Sara Akbar, and Hydro-C, Mr Hassan Heshmat, will discuss sustainable energy, and a separate session will be voted to Basrah Gas Company.

The Finance panel includes a stella line up with Emirates Credit Insurance Co, Standard Chartered Bank and IFC. Mr Aziz Khudairi heads the Industry panel and a significant group including Martrade and IBBC Autumn Conference Principal Sponsor Sardar Group.

Finally, and in parallel, an online Tech forum session on Data and its benefits to Government, Economies, business, and citizens, will include speakers from UK’s GDS, British Water, Agri-epicentre, Serco and Mastercard with more to be confirmed.

Overall, the panels will be exploring in more detail how to ensure the current high oil and gas prices can bring investment and rebalance the economy and promote and develop agriculture and enhance the food chain to increase employment and reduce food poverty. These discussions will also address how to improve the water supply and waste reduction and consider the role of clean power generation in relation to climate change and initiatives to improve sustainability.

We look forward to welcoming you to Dubai, or even following us online if you are unable to make it in person.

A pre-conference reception will be held at the Iraqi Pavilion at Dubai EXPO2020 in the evening of 21st November.

Finally, we’d very much like to thank our sponsors: Principal Sponsor Sardar Group, Gold Sponsor: Hydro-C, Silver Sponsor: Serco and Reception Sponsor: Basra Gateway Terminal

(Source: IBBC)

The post IBBC’s Autumn Conference – Open for Business Engagement first appeared on Iraq Business News.

INOC to be Partner in TotalEnergies Basra Projects

By John Lee.

The Iraqi cabinet has approved a plan for the newly-formed Iraqi National Oil Company (INOC) to be a financial partner with TotalEnergies in its projects in Basra.

It said it will support INOC to “maximize revenues and financial returns to the general budget.

In September, TotalEnergies signed a number of major agreements covering several projects in the Basra region, designed to enhance the development of Iraq’s natural resources to improve the country’s electricity supply.

These agreements include:

  • The construction of a new gas gathering network and treatment units to supply the local power stations, with TotalEnergies also bringing its expertise to optimize the oil and gas production of the Ratawi field, by building and operating new capacities.
  • The construction of a large-scale seawater treatment unit to increase water injection capacities in southern Iraq fields without increasing water withdrawals as the country is currently facing a water-stress situation. This water injection is required to maintain pressure in several fields and as such will help optimizing the production of the natural resources in the Basra region.
  • The construction and operation of a photovoltaic power plant with a capacity of 1 GWp to supply electricity to the grid in the Basra region.

(Source: Govt of Iraq)

The post INOC to be Partner in TotalEnergies Basra Projects first appeared on Iraq Business News.

Iraqi Cabinet Approves TotalEnergies’ Projects

By John Lee.

The Iraqi cabinet has approved the agreement between the Ministry of Oil and French company TotalEnergies to implement four major energy projects in the country:

  1. Plants to collect and refine associated natural gas at the fields of Artawi [Ratawi], West Qurna 2, Majnoon, Tuba [Subba] and Lahais [Luhais]. This will include a Central Gas Complex at Artawi;
  2. Development of the Artawi field;
  3. The integrated seawater project [Common Seawater Supply Project (CSSP)?], which the ministry has been trying to implement for more than ten years; and,
  4. A 1,000MW solar energy plant.

The project was originally agreed in March.

(Source: Govt of Iraq)

The post Iraqi Cabinet Approves TotalEnergies’ Projects first appeared on Iraq Business News.

IOC’s Strategic Positioning in Iraqi Upstream Petroleum

By Ahmed Mousa Jiyad.

Any opinions expressed are those of the author, and do not necessarily reflect the views of Iraq Business News.

IOC’s Strategic Positioning in Iraq Upstream Petroleum

Much talk have been circulating recently on “Big Oil” abandoning Iraq upstream petroleum projects after they rushed into the country many years ago. How much truth is in this; who is leaving, remaining and planning a comeback; why and what material evidences are available to provide verifiable realistic explanation are some of the topics this brief intervention attempts to address.

IOCs positioning in Iraq upstream petroleum have seen a dramatic shift since a Grand Opining Big Push Policy- GOBPP was pursued in 2004; offering IOCs opportunities to achieving unprecedented expansion in the petroleum production capacity during short period.

Their involvement and strategic positioning went through three phases: the first, 2004 to end 2008, comprises many memoranda of understanding/cooperation (MoU/Cs ) in search for foothold and as springboard for further opportunities; transparent competitive bidding phase, June 2009 to May 2012, includes four bid rounds and, third phase covers contracts implementation that began from January 2010 up to date.

Ministry of Oil- MoO concluded some 40 MoU/Cs with IOCs from 23 countries, with overwhelming dominance of the US (9); Japan and Norway (4 each); China, UAE, UK and Canada (2 each) and one company from 16 countries.

For IOCs, MoU/Cs represent invaluable direct contact with Iraqi staff and professionals at all layers of responsibility and access to most archives and database relating to upstream petroleum; that helped IOCs exploring where and what they could do to chart their way towards business in Iraq’s upstream petroleum and beyond, i.e., to plan their strategic positioning in the sector. Some IOCs had their MoU/C terminated and were blacklisted from further involvement in upstream petroleum projects, due to their agreements with KRG in violation of the government declared policy.

MoU/Cs contributed in formulating and development of a model contract, and by the time they were terminated MoO succeeded, through direct government-to-government talks (with China), in converting Alahdab oilfield from production sharing to service contract. That conversion presents the model for what MoO offers: a long term service contract not a production sharing contract; an outcome many IOCs had not hoped for and probably impacted their decision for further undertaking.

The first bid round, for brown oilfields, was held end June 2009, followed by three bid rounds for green fields, gas fields and exploration blocks respectively; the last was convened end May 2012.

120 IOCs participated in the qualification process for the bid rounds, 55 from 27 countries were qualified: Japan (9); USA (7); Russia (5); China and UK (4 each); Australia, India and Italy (2 each), and 19 other countries with one company each; a different profile from phase one with obvious strategic positioning implications.

The outcome of the four bid rounds and Alahdab are: 14 oilfields contracted to 15 IOCs from 12 countries; a consolidation of strategic positioning. Total contracted plateau production was 12.3mbd and their total proven reserves ca. 67 billion barrels (58% of the country’s proven reserves at that time). Three gas fields were contracted to 3 IOCs from 3 countries with total plateau production of 820mcfd and proven reserves of 11.2tcf. Finally, four exploration blocks were contracts with 7 IOCs from 5 countries resulting in discovery of Fayha and Eridu oilfields.

The contracted plateau production of 12.3mbd was IOCs making that proven to be unrealistic and unattainable, thus, consequently revised downward repeatedly!!

During the second phase many meaningful signs for significant shift in IOCs strategic positioning began to emerge, the most apparent consolidation was Russia.

The third phase, i.e., contracts implementation period, witnessed the most dramatic effective and lasting shifts in IOCs strategic positioning.

A complexity of combined reasons had contributed to such an outcome; some are related to IOCs themselves, others related to the Iraqi side (entities, policies and circumstances), while the rest are related to a variety of international factors and geopolitical considerations. Space limitation prevents from indulging in the details of relevant data, facts and documents, but it is useful to mention the most impacting among them: Fracking revolution in the US; ISIS and oil price collapse in mid-June 2014 that inflicted serious blow to Iraq fiscal, security and developmental efforts; OPEC+ impact on Iraq production; Covid-19 and finally energy/green transition and climate change debate.

However, it is vital to highlight briefly the IOCs that strengthened or weakened their positions during this phase.

In the context of Iraqi GOBPP, strategic positioning is taken here to mean IOCs persistent, competitive, enhanced and long-term underrating in Iraq upstream petroleum. Three dimensions manifest IOC involvement and its strategic positioning: horizontal (in multi-fields), vertical (the participating interest-PI in the fields) and volumetric (in terms of proven reserves and production due to field development).

From November 2013 China began enhancing its presence in the country through consolidating CNPC , CNOOC, ZhenHua , Sinopec , UEG and probably CPECC, which   invests in utilizing all associated gas produced in Missan Province . In addition to the above, there are many Chines service companies that are involved in upstream petroleum activities such as drilling, supply and construct surface installations, pipelines, field management among others.

Russian Lukoil enhanced its position vertically horizontally and volumetric in West Qurna 2-WQ2 oilfield and in exploration Block 10 that led to Eridu oilfield discovery; Lukoil found other reservoirs beyond the field’s current borders and thus requested to expand Eridu field. Surprisingly, the Oil Minister reportedly said recently Lukoil intends to sell its PI in WQ2 to a Chines company!

Other Russian IOCs with bid round contracts include Gazprom (operator of Badra oilfield) and Bashneft/ Rosneft (for Exploration Block 12), KRG not included here.

In addition to Chines and Russian IOCs Japanese companies increased their presence as well: Japex (Gharraf oilfield); INPEX (Exploration Block 10/Eridu oilfield) and Itochu bought entire Shell’ PI (20%) in WQ1.

Against the consolidation of the Chines, Russian and Japanese companies, other IOCs lost or weakened their presence in upstream petroleum; these include Big Oil- as ExxonMobil, Shell and Oxy and medium-small size companies such as Petronas, Kogas, Kuwait Energy, TPAO.

Occidental Petroleum relinquished, in 2016, its PI in Zubair oilfield to South Oil Company (now Basra Oil Company), due to its decision pulling out from projects in the Middle East for financial reasons.

ExxonMobil demise began almost ten years ago soon after it had attained significant consolidation; a demise of its own making!! Apart from the contribution of the Iraqi factors ExxonMobil faced and facing many other challenges that exacerbate its decision to abandon Iraq. These include restructuring its international profile; energy transition (away from fossil-based to renewable-energy) environmentally-conscious; shareholder revolts, expulsion of ExxonMobil representative from EITI’MSG due to position regarding Dobb-Franck issue and the forthcoming SEC environmental compliance rules.

Royal Shell story is not very different from that of ExxonMobil. Shell launched initially a powerful strategic positioning, resisted the temptation of engaging with KRG petroleum and diversified its portfolio in oil, gas and petrochemical projects. Now it has much weakened role; withdrew from Majnoon oilfield, sold its PI in WQ1, rumors that it contemplate leaving Basra Gas Compan- BGC , whose  HoA was signed in 2008 but it did not deliver the contracted target, and Nibras petrochemical project, with MIM & MoO, draggeed for too many years without any prospect.

Again, Shell decision to leave WQ1 and Majnoon oilfields and possibly BGC was not entirely due to contractual and working conditions in Iraq; one possible explanation relates to Shell’ overall plan to restructure its global business, following its takeover of British Gas Group- BGG. Also Shell faces legal action; A Dutch court ruled, recently, that Shell will have to reduce its carbon emissions by 45 percent from 2019 levels by 2030.

BP has only one engagement- Rumaila oilfield, with almost equal PI with CNPC (while during the June 2009 bidding round BP’ PI was double that of CNPC). Recently, BP decided to spin off its involvement in Rumaila into a stand-alone company, a “ring fencing practice”, for reasons relating to diverting its global assets and investment plans.  Though this move is more structural and organizational in nature that has, contractually, no effect on Iraq, it, nevertheless, could indicate possible departure from Rumaila sooner or later.

Total, rebranded TotalEnergies, have very modest PI in only one oilfield- Halfaya, is trying a comeback to Iraq through concluding HoA comprising four major projects, three of which are part of SIIP that Iraq wasted too many years discussing with ExxonMobil!!

Surely, IOCs strategic positioning has significant implications for petroleum sector and the prospect of the entire economy. There has been a tendency for some to be highly selective by focusing only on one Iraqi based, real reason, such as harsh contractual terms; type of contracts; corruption, resource mismanagement and security conditions among others. While all these are real and effective, they are absolutely not the only factors behind IOCs shift and change of priorities as there is a complex wed that one should be aware of; 20 IOCs have recently warned for tax violation and IOCs that lost their strategic positioning inside Iraqi petroleum had themselves contributed to that outcome.

Moreover, global energy/green transition and international geopolitics have powerful ramifications though the debate is, as usual, not conclusive. While IEA recent report could have effective impact, REN21 new report raises doubt; and such wide divergence suggests oil remains needed much longer than some thinks.

Click here to download the full report in pdf format.

Mr Jiyad is an independent development consultant, scholar and Associate with the former Centre for Global Energy Studies (CGES), London. He was formerly a senior economist with the Iraq National Oil Company and Iraq’s Ministry of Oil, Chief Expert for the Council of Ministers, Director at the Ministry of Trade, and International Specialist with UN organizations in Uganda, Sudan and Jordan. He is now based in Norway (Email: mou-jiya(at)online.no, Skype ID: Ahmed Mousa Jiyad). Read more of Mr Jiyad’s biography here.

The post IOC’s Strategic Positioning in Iraqi Upstream Petroleum first appeared on Iraq Business News.

Iraqi Cabinet Awards Energy Contracts

By John Lee.

At its regular meeting on Tuesday, the Iraqi Cabinet agreed to send an invitation, “in a single bid manner“, to the French company Total to invest in a project to generate 1,000 megawatts of solar electric power.

The project was originally agreed in March as part of a larger engagement with the French energy company, which last week announced that it would rebrand itself as TotalEnergies.

The cabinet also approved a request from the Ministry of Electricity to award a contract “in a single bidding manner” to the Chinese company PowerChina (Power Construction Corporation of China).

(Source: Govt of Iraq)

The post Iraqi Cabinet Awards Energy Contracts first appeared on Iraq Business News.

Iraq to Exploit Massive Natural Gas Reserves

Iraq Moves To Exploit Its Massive Natural Gas Reserves

Writing in Oil Price, Simon Watkins says that despite Iraq’s huge potential gas resources, it has made little progress on developing this potential either for associated or non-associated gas.

But last week, a heads-of-agreement deal was announced with Total, to work jointly on four major projects that include developing the associated gas sector.

Click here to read the full story.

The post Iraq to Exploit Massive Natural Gas Reserves first appeared on Iraq Business News.

Iraq signs 4 Major Energy Deals with Total

By John Lee.

Iraq’s Ministry of Oil has signs an agreement of principles with the French company Total for four major energy projects in the country:

  1. Plants to collect and refine associated natural gas at the fields of Artawi [Ratawi], West Qurna 2, Majnoon, Tuba [Subba] and Lahais [Luhais]. This will include a Central Gas Complex at Artawi;
  2. Development of the Artawi field;
  3. The integrated seawater project [Common Seawater Supply Project (CSSP)?], which the ministry has been trying to implement for more than ten years; and,
  4. A 1,000MW solar energy plant.

Full statement here (Arabic)

(Source: Ministry of Oil)

The post Iraq signs 4 Major Energy Deals with Total first appeared on Iraq Business News.

Iraq plans 20GW Solar Power by 2030

By John Lee.

Iraq’s Minister of Oil has his Ministry’s goal is to support the Ministry of Electricity to have 20 gigawatts of solar energy capacity installed by 2030.

In a promotional video issued by the Government of Iraq, Ihsan Abdul Jabbar added that the recently-announced partnership with French energy company Total will include the production of clean solar energy in Southern Iraq.

He said the Ministry was in discussion with other oil producers, including BP, to use their sites to produce solar power.

(Source: Govt of Iraq)

The post Iraq plans 20GW Solar Power by 2030 first appeared on Iraq Business News.

Iraq and Total sign MoU for “Large Projects”

By John Lee.

Iraq’s Ministry of Oil has signed a Memorandum of Understanding with French oil company Total.

According to a statement from the Ministry, both sides have “achieved advanced cooperation steps towards implementing large projects in the oil and energy sector.”

The document was signed in Baghdad by Oil Minister Ihsan Abdul-Jabbar Ismail and the CEO of Total, Patrick Pouyanné.

(Source: Iraqi Ministry of Oil)

The post Iraq and Total sign MoU for “Large Projects” first appeared on Iraq Business News.

KRG proposes new Minister of Natural Resources

By John Lee.

The Prime Minister of the Kurdistan Regional Government (KRG), Masrour Barzani, has nominated Dr. Kamal Atroshi to the post of Minister of Natural Resources, a position which includes responsibility for the oil and gas portfolio.

A statement from KRG spokesperson Dr. Jotiar Adil said, “It is our hope that the Kurdistan Parliament includes this topic in its next session and provides a vote of confidence“.

According to his Linked-In profile, Dr al-Atroshi was educated in Iraq and France, and has worked extensively in the oil sector in Kuwait. He has held positions with the Kuwait Foreign Petroleum Exploration Company (KUFPEC), Gas & Oil Field Services Company (GOFSCO), and Total.

(Sources: Kurdistan Regional Government, Linked-In)

The post KRG proposes new Minister of Natural Resources first appeared on Iraq Business News.