235-MW Rumaila Power Station Opened

By John Lee.

Oil Minister Jabar Ali al-Luaibi [Allibi, Luiebi] has officially opened the Rumaila power station.

The construction of the 235 MW plant was supervised by the China Petroleum Engineering & Construction Corporation (CPECC), the engineering and construction subsidiary of the China National Petroleum Corporation (CNPC).

The Minister said the project is considered as one of the largest projects organized by the Rumaila Operating Organization (ROO), which includes Basrah Oil Company (BOC), BP and PetroChina.

(Source: Ministry of Oil)