Oil Production Falls at Garraf Field

By John Lee.

Production at the Garraf [Gharraf] oil field in southern Iraq has reportedly fallen to an average of around 93,000 barrels per day (bpd) in January.

According to S&P Global Platts, officials from Japan Petroleum Exploration (JAPEX) said on Monday that the drop was due to delays in drilling works.

It added that takeholders remained committed to increasing output to 230,000 bpd by the end of 2020.

Japex, which has a 35-percent stake in the field, issued results for the nine months to the end of December on Monday – see here and here.

(Source: S&P Global Platts)

Oil Production to Increase at Gharaf

By John Lee.

Japex is reportedly planning to increase production at the Gharaf oil field from around 90,000 barrels of oil per day (bpd) currently to 230,000 bpd by the end of 2020.

S&P Global Platts quotes Japex director Michiro Yamashita as saying that the company has allocated capital expenditure of $460 million for the project in fiscal 2019-20 (April-March).

(Source: S&P Global Platts)

Turkish Firm wins Contract at Garraf

Turkish oil and gas services company Ergil has been awarded a design, engineering, fabrication, and testing contract by China Petroleum Engineering & Construction Corporation ( CPECC), for PetronasGarraf oil field.

The company says it has completed designing, manufacturing and supplying of 12 units 320-bar high-pressure pig receivers and launchers, 28 units pig signallers, 12 units manual pig jib crane and 8 units pig trolley.

The field is owned by Petronas (45%), Japex (30%) and the North Oil Company (25%).

(Source: Ergil)

Baker Hughes to harness Flare Gas at Gharraf & Nassiriya

By John Lee.

Baker Hughes has signed a contract to harness 200 MMcf/d of natural gas from Iraq’s Nassiriya and Gharraf oil fields.

The Nassiriya field is operated by the state-run Dhi Qar Oil Company (DQOC) and currently producing around 70,000 barrels per day of crude oil, with a target of 150,000 bpd.

Gharraf is operated by Petronas and is producing around 88,000 bpd with a plateau production target of 250,000 bpd.

(Sources: Minister of Oil, Platts)